{"id":5942,"date":"2015-03-25T20:15:24","date_gmt":"2015-03-26T02:15:24","guid":{"rendered":"http:\/\/enconecte.com\/?p=5942"},"modified":"2015-12-24T19:02:45","modified_gmt":"2015-12-25T01:02:45","slug":"casi-listos-boulevard-suave-patria-y-puente-peatonal-del-rio-grande","status":"publish","type":"post","link":"https:\/\/enconecte.com\/?p=5942","title":{"rendered":"Casi listos boulevard Suave Patria y puente peatonal del R\u00edo Grande"},"content":{"rendered":"<ul>\n<li>Alcalde supervisa avances<\/li>\n<\/ul>\n<p>Eustaquio M\u00e1rquez S\u00e1nchez, presidente municipal de Jerez, supervis\u00f3 los importantes avances que presentan el Boulevard Suave Patria y el puente peatonal del R\u00edo Grande, ambas obras casi a punto de concluir.<\/p>\n<p>Acompa\u00f1ado por el director Obras y Servicios P\u00fablicos Jos\u00e9 \u00c1ngel Flores Guti\u00e9rrez y regidores del Ayuntamiento, se percat\u00f3 del avance del 85 por ciento que presenta el boulevard Suave Patria, que se estima estar\u00e1 listo para Feria de Primavera Jerez 2015.<\/p>\n<p>Flores Guti\u00e9rrez explic\u00f3 que las lluvias generaron grandes atrasos, sin embargo para el jueves las labores en dicho boulevard estar\u00e1n concluyendo, dejando un periodo aproximado de una semana para el fraguado del mismo.<\/p>\n<p>Con respecto al puente peatonal del R\u00edo Grande, \u00e9ste presenta un 40 por ciento de avance, teniendo hasta el momento puestas las bases donde se comenzar\u00e1n a montar los prefabricados.<\/p>\n<p>El fin de semana se estar\u00e1 efectuando la colocaci\u00f3n del puente y barandales, el cual no se concluir\u00e1 en su totalidad de acuerdo al proyecto inicial en lo que se refiera a acabados est\u00e9ticos, pero s\u00ed en funcionalidad.<\/p>\n<p>Esto significa que estar\u00e1 en las condiciones requeridas, para soportar la afluencia de p\u00fablico que se espera en los espect\u00e1culos del Teatro del Pueblo.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Alcalde supervisa avances Eustaquio M\u00e1rquez S\u00e1nchez, presidente municipal de Jerez, supervis\u00f3 los importantes avances que presentan el Boulevard Suave Patria y el puente peatonal del R\u00edo Grande, ambas obras casi a punto de concluir. Acompa\u00f1ado por el director Obras y Servicios P\u00fablicos Jos\u00e9 \u00c1ngel Flores Guti\u00e9rrez y regidores del Ayuntamiento, se percat\u00f3 del avance del [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":5943,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1370],"tags":[216,26],"class_list":["post-5942","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-jerez","tag-feria","tag-jerez"],"_links":{"self":[{"href":"https:\/\/enconecte.com\/index.php?rest_route=\/wp\/v2\/posts\/5942","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enconecte.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enconecte.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enconecte.com\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/enconecte.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5942"}],"version-history":[{"count":0,"href":"https:\/\/enconecte.com\/index.php?rest_route=\/wp\/v2\/posts\/5942\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enconecte.com\/index.php?rest_route=\/wp\/v2\/media\/5943"}],"wp:attachment":[{"href":"https:\/\/enconecte.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5942"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enconecte.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5942"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enconecte.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5942"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}